Spring Renovations at Lyford!

We've been busy at work this spring, continuing with the renovations begun last fall.
Green Drake cabin is undergoing rehab to replace its rotted base logs and sagging floors. New larger windows will brighten up the interior while helping reduce heat loss in the winter, along with all new chinking. In addition the cabin is being made ADA accessible and will also include an electrical outlet for CPAP machines.
We're completing new paths and walkways to the cabins, reducing erosion and slippery slopes on those wet days.


New roof and covered entrance to the Lodge. Site work and landscaping around the Lodge is currently underway.

The new sitting and reading area upstairs in the Lodge has been completed.

New fireplace and chimney has been finished, replacing the previously unusable one. The chimney was also relocated to create more space in the dining area.